01
BOM and revision review
Confirm component versions, hardware, labels and work instructions before assembly.
Build configuration confirmed

Build ready-to-install kits and subassemblies with formed parts, machined components, hardware, labels and packaging coordinated to your assembly instructions.
Assembly and kitting support for industrial equipment, automation, electronics, mobility and custom OEM programs.
A quick view of the information buyers need before sending an assembly or kitting RFQ. Final scope is confirmed against BOM, revision, hardware, packaging and inspection requirements.

| Parameter | Capability details |
|---|---|
| Assembly Scope | Fastening, riveting, welding, hardware installation, labeling and kitting |
| Assembly Envelope | To be confirmed - reserve fixture, handling and pack envelope |
| BOM / Revision | To be confirmed - customer BOM, revision and work instruction required |
| Typical Tolerance | To be confirmed - quote-specific assembly and interface range |
| Components | Machined, cast, forged, fabricated, purchased and finished components |
| Packaging | Trays, bags, cartons, returnable packs or customer-specific packaging |
| Production Volume | Prototype, low-volume and batch production |
| Accepted Drawing Formats | STEP, IGES, Parasolid, SolidWorks, PDF drawing and DXF |

01
Confirm component versions, hardware, labels and work instructions before assembly.
Build configuration confirmed
02
Use assembly aids and checks to protect orientation, torque and interface requirements.
Assembly interfaces controlled
03
Verify count, configuration, packaging and traceability before release.
Kit contents verified for release

Assembly fixtures, torque and rivet tools, benches and organized component storage support controlled builds.
Formed parts, machined components, hardware and kit trays are arranged around the approved BOM.
Completed kits, packaging references and fit-check fixtures support final count and configuration checks.

Panels, hardware and labels coordinated into installation-ready enclosure kits.
Guards and mounting components assembled to the approved configuration.
Mechanical parts and hardware checked against defined module interfaces.
Brackets and specified fasteners grouped by BOM, quantity and revision.
Panels and structural members joined with fit and alignment checks.
Customer-specific parts, labels and packaging organized for downstream installation.

rigid structures
corrosion-resistant assemblies
lightweight panels
conductive inserts
insulators and hardware
Verify component identity, quantity and revision against the approved BOM.
Check orientation, interfaces and specified fastener requirements during assembly.
Compare the completed build, labels and pack configuration with approved instructions.
Confirm kit contents and agreed functional checks before release.


01
Confirm fit, hardware, labels, pack configuration and work instructions.
02
Build launch quantities with controlled BOM and inspection checkpoints.
03
Repeat the approved assembly and kitting route with traceable release.
01
Confirm component versions, work instructions and kit contents before assembly.
02
Coordinate manufactured parts, purchased hardware and finished interfaces within one build plan.
03
Validate the initial kit before launch quantities and repeat builds.
04
Check assembly interfaces, kit quantities and packaging against approved requirements.
05
Agree inspection, packing and component traceability records during quotation.
06
Review the BOM, revision, hardware and delivery configuration to define a complete quotation.
Customer BOMs can be reviewed for subassembly, hardware installation and kitting. Provide the component drawings, revision, quantities and work instructions to confirm the assembly scope.
Hardware installation, labels and packaging can be included in an agreed assembly plan. Specify fasteners, label content, pack configuration and any torque or fit requirements.
Prototype kits and low-volume launch quantities can be reviewed before batch production. An initial kit can be used to confirm fit, hardware, labels and packaging.
Assembly can follow approved, revision-controlled BOMs and work instructions. Changes to components, labels or packaging must be confirmed before the affected build is released.
Assembly inspection and packing records can be provided when included in the agreed release plan. Share required checks, traceability fields and reporting formats during quotation.
Send the assembly model, component drawings, BOM, revision and quantity. Include the hardware list, work instructions, packaging and inspection requirements.
Send the assembly model, BOM, revision and quantity. We will review fit, hardware, packaging and inspection requirements before quoting.

Related engineering and value-added services